This track was identified and mapped via high-resolution satellite imagery.
Roing to Hunli via Mayudia Pass
The road from Roing climbs through forest to Mayudia Pass, a hill stop that gets snowfall from November to March, and continues to Hunli on the road to Anini. The tourism department describes the Roing-Hunli stretch as a well-maintained blacktop road.
Trail Map
Initialising Map Engine...
Trail Profile
General Instructions
Mayudia is about 56 km from Roing and Hunli about 90 km. Snow and ice can close the pass in January-February; landslides are common in the monsoon.
Weather check
Sampling Micro-Climate...
28.1429, 95.8428
Slide to preview conditions across the entire route • Point: 28.1429, 95.8428 @ 414m
Quick Stats
Highlights
- See snow at Mayudia between December and February
- Stop at Sally Lake near Roing
- Visit the Bhismaknagar archaeological site near Roing
- Bird-watch in the forests below Mayudia
- Continue towards Anini on the same road
Field Radio Protocol
VHF-UHF Communication
Propagation Telemetry
Ridge Line
92%Gorge Floor
18%Sector Relay: Sector Alpha Relay• 12-18 KM Range
Regulatory Compliance
VHF/UHF frequencies are for monitoring and emergency coordination only. Transmitting on these bands may require an Amateur Radio License or regional government permits. Check local telecommunications laws before operation.
Technical Analysis
Total Ascent
+2319 m
Total Descent
-1391 m
Ruggedness Index
Terrain Roughness Index
Vertical displacement per km. Typical range: 0 (Smooth) to 100+ (Extreme Mountain).
45.0
Tortuosity Index
Route Curviness Index
Ratio of actual path to straight line. Typical range: 1.0 (Direct) to 3.0+ (Switchbacks).
3.67
Gradient Distribution
Surface & Hydrology
Surface Spectrum Analysis
Includes only technical water fords where the vehicle actively enters a stream or riverbed. Permanent bridges are excluded from this count.
Difficulty Analysis
Difficulty is determined by a technical multi-vector analysis of elevation profile, surface quality, and topographic intensity.
Bounding Box (WGS84)
Point Spacing: 23.4 m • Engine: TrailX Precision GPX ANALYTICS v1.0.0
Reviews & Discussion0
Expedition notes, route modifications, and surface updates shared by the community.
Log Expedition Notes
You must be signed in to contribute reviews
Authenticate IdentityBe the first to review
No reviews registered for this technical sector yet. Share your experience, surface observations, or gear recommendations!
Plan this trip
Before you go: Roing to Hunli via Mayudia Pass
Best time to go
Oct–Mar
October to March suits most of the country. The southwest monsoon (June to September) floods the Western Ghats and Kerala, but it is also the main season for Ladakh and Spiti, where high passes are usually open only from June to October.
Navigate it offline
Download this trail and its map in the free TrailX app for turn-by-turn guidance, off-route alerts and GPS recording without signal.
Open in TrailX appNearby
Trails near Roing to Hunli via Mayudia Pass
Tezu to Parshuram Kund
40.5 km from this trail
- Distance
- 44 km
- Max elev.
- 1,045 m
Pasighat to Yingkiong along the Siang
51.0 km from this trail
- Distance
- 123 km
- Max elev.
- 1,371 m
Aalo to Mechuka Road
102.3 km from this trail
- Distance
- 169 km
- Max elev.
- 2,085 m
Sivasagar Ahom Heritage Ride
175.2 km from this trail
- Distance
- 9.1 km
- Max elev.
- 98 m
Ziro Valley Village Loop
210.4 km from this trail
- Distance
- 27 km
- Max elev.
- 1,588 m
Ziro to Daporijo Road
210.4 km from this trail
- Distance
- 162 km
- Max elev.
- 1,804 m