This track was recorded on the ground by an actual expedition vehicle.
Senzaki to Yamaguchi Ride
72.5 km paved ride from Senzaki on the Sea of Japan coast across the hills to Yamaguchi city, with about 500 m of climbing.
Trail Map
Initialising Map Engine...
Trail Profile
General Instructions
Ride on the left and plan a train back from Yamaguchi, as this is a one-way route.
Weather check
Sampling Micro-Climate...
34.3921, 131.2001
Slide to preview conditions across the entire route • Point: 34.3921, 131.2001 @ 20m
Quick Stats
Highlights
- Senzaki
- Nagato Yumoto Onsen
- Yamaguchi
Field Radio Protocol
VHF-UHF Communication
Propagation Telemetry
Ridge Line
92%Gorge Floor
18%Sector Relay: Sector Alpha Relay• 12-18 KM Range
Regulatory Compliance
VHF/UHF frequencies are for monitoring and emergency coordination only. Transmitting on these bands may require an Amateur Radio License or regional government permits. Check local telecommunications laws before operation.
Technical Analysis
Total Ascent
+498 m
Total Descent
-507 m
Ruggedness Index
Terrain Roughness Index
Vertical displacement per km. Typical range: 0 (Smooth) to 100+ (Extreme Mountain).
13.9
Tortuosity Index
Route Curviness Index
Ratio of actual path to straight line. Typical range: 1.0 (Direct) to 3.0+ (Switchbacks).
1.91
Gradient Distribution
Surface & Hydrology
Surface Spectrum Analysis
Includes only technical water fords where the vehicle actively enters a stream or riverbed. Permanent bridges are excluded from this count.
Difficulty Analysis
Difficulty is determined by a technical multi-vector analysis of elevation profile, surface quality, and topographic intensity.
Bounding Box (WGS84)
Point Spacing: 13.4 m • Engine: TrailX Precision GPX ANALYTICS v1.0.0
Reviews & Discussion0
Expedition notes, route modifications, and surface updates shared by the community.
Log Expedition Notes
You must be signed in to contribute reviews
Authenticate IdentityBe the first to review
No reviews registered for this technical sector yet. Share your experience, surface observations, or gear recommendations!
Plan this trip
Before you go: Senzaki to Yamaguchi Ride
Best time to go
Apr, May, Oct, Nov
Mount Fuji's official climbing season runs only from early July to early September. For other routes, April to May and October to November are best. The rainy season (June to mid-July) and the typhoons of August and September can disrupt plans.
More like this
Navigate it offline
Download this trail and its map in the free TrailX app for turn-by-turn guidance, off-route alerts and GPS recording without signal.
Open in TrailX appNearby